NEW PRODUCT ANNOUNCEMENT
A Static Waste Plant that is installed in 1 day!
The Ks 615 offers a same-day ‘plug & play’ guarantee – offload the unit from the trailer and raise into position, fit the steps, connect to mains electricity or generator, switch power on and start loading the plant with mixed waste. The Ks 615 is ‘patent pending’ and is ideal for processing Construction & Demolition (C&D) and other waste streams.
Contact our sales team on +44 (0) 28 8773 8811
About Us
As well as our own manufactured equipment, we also incorporate market leading technology from around the world.
So, whether you are a small or a large plant operator, we can provide you with a solution that suits your requirements and your waste stream.
Our Featured Projects

Averda
Project : Construction & Demolition
Handover Date: September 2020
Location: Kingdom of Saudi Arabia
Kiverco has been chosen to design, build and install a waste recycling plant that will help recycle all construction waste from the highly acclaimed The Red Sea Project in the Kingdom of Saudi Arabia.
Remondis
Project : Construction & Demolition
Handover Date: June 2019
Location: Co.Durham, UK
The customer required a redevelopment one of their C&D Recycling facilities.They required a higher level of automation, reduction in manpower and improvements in the quality of the job in the picking stations.

McQuillan Environmental
Project : Dry Mixed Waste
Handover Date: September 2018
Location: Dundrod, Co. Antrim, N. Ireland
We recently completed a multi-million pound installation of a new, state-of-the-art recycling facility at McQuillan Environmental. One of the drivers for this new recycling plant was to dramatically improve the quality and "purity" of the waste products produced.
Westminster Waste
Project : Wood/Biomass
Handover Date: August 2018
Location: London, UK
Westminster Waste, based in the heart of London, required major upgrades of their processing plant this year. As an innovative and fast-moving company, one of their key objectives is zero waste to landfill.


Sharp Skips
Project : Construction & Demolition Waste
Handover Date: January 2018
Location: London, UK
Sharp Skips required a new recycling plant to increase their efficiency and production. They were eager to ensure all the best technology would be incorporated into the plant such as Kiverco, Steinert and Spaleck equipment.
Modular Solutions

Designed for the small to medium waste processing operator or mobile contractor, certain modular components can be selected and set up within hours - giving all the benefits of a high performance static plant.
Find out more

Find out more

